
Previous
65' Viking Enclosed Bridge (Traditional Ladder Steps)
This 9' gap enclosed bridge tower has its front legs mounted to the front of the bridge as well as having traditional ladder steps on either side like a convertible. The bridge deck was also extend out as you will see in one of the photos per the owner.
Side Profile View
Aft Perspective View
Aft Bridge Overhand Extended Out

Phone: (561) 493-2828
Fax: (561) 493-5749
2100 Avenue B
Riviera Beach, FL 33404
311B Facility Dr
Morehead City, NC 28557
5738 Route 9
New Gretna, NJ 08224